FASTECH logo

Time-Fill Post for CNG Fleets

FASTECH’s Time-Fill Post for compressed natural gas (CNG) fleets is built to match the highest CNG equipment standards.

Save costs
by fueling overnight when rates are lower
Modular design
for flexibility of location and expansion of system
FASTECH’s Time-Fill Post Features

FASTECH’s Time-Fill Post Features

  • 1-4 hoses on the same post
  • Multiple bracket options (Caisson or K-Rail) with 8-hole mounting base
  • Minimal assembly and simple operation
  • Modular design for flexibility of location and expansion of system
  • Patented safety feature prevents damage after drive-off incidents
  • Retractor system to prevent dragging nozzle
  • Lifetime warranty

Time Fill Post Overview

Need Help With Your CNG Fueling Project?

Need Help With Your CNG Fueling Project?

FASTECH provides complete end-to-end services for CNG fueling station construction, as well as other alternative fuel sources. Contact us today for more information about our patented Time-Fill Post and other fueling solutions.

Request quote