Time-Fill Post for CNG Fleets
FASTECH’s Time-Fill Post for compressed natural gas (CNG) fleets is built to match the highest CNG equipment standards.
- Save costs
- by fueling overnight when rates are lower
- Modular design
- for flexibility of location and expansion of system
FASTECH’s Time-Fill Post Features
- 1-4 hoses on the same post
- Multiple bracket options (Caisson or K-Rail) with 8-hole mounting base
- Minimal assembly and simple operation
- Modular design for flexibility of location and expansion of system
- Patented safety feature prevents damage after drive-off incidents
- Retractor system to prevent dragging nozzle
- Lifetime warranty
Need Help With Your CNG Fueling Project?
FASTECH provides complete end-to-end services for CNG fueling station construction, as well as other alternative fuel sources. Contact us today for more information about our patented Time-Fill Post and other fueling solutions.